• #127
Absolutely, what size do we want?
50x20m is the size of Roller Hockey rinks, which is what US are starting to model polo courts on IME.
45x20m might be a little bit more manageable for players of all levels. This court needs to be the best court in London to get people showing up for regular sessions. If we get the size right it'd be awesome.
I can only help at weekends, too.
-
• #128
The court in Paris is 44x22, and it's awesome.
-
• #129
You serious snoops?
50x20m is the size of Roller Hockey rinks, which is what US are starting to model polo courts on IME.
**45x20m **might be a little bit more manageable for players of all levels. This court needs to be the best court in London to get people showing up for regular sessions. If we get the size right it'd be awesome.
I can only help at weekends, too.
Read this again:
The total space is **39m x 36m **with an extra 2m or so for access along the south side...
Massive image of it here...
-
• #130
Monday
- dt
- TS
Tuesday
- dt
- TS
- B
- Antonio
Sorry I'm out, I've got a couple of interviews to go to.
- dt
-
• #131
Monday
- dt
- TS
Tuesday
- dt
- TS
- B
- Antonio
- Paul
- dt
-
• #132
Everyone forget the midweek list and worry about being around on the 21st.
-
• #133
I can do the morning of the 21st and have the car too.
-
• #134
What Tim said, had a meeting with HH yesterday followed by an informal courts meeting at Ryan's stag-do...
We decided the best thing to do is build and paint the court in one go on the 21st Sept...
Thanks, Matt, I'll keep you posted tho' I think you're car'll be too small... We may just hire a man with a Luton van...
-
• #135
So the court build is gonna be happening this Saturday...
We're gonna need:
• To mark the court out this week before the weekend as well as putting a test screw into the tarmac to show HH we aren't gonna be ruining the surface
• Van and driver (maybe it'll be less hassle to book a man and Luton van, thoughts?)
• Lots of helpers to load the van in Hackney
• Lots of helpers to unload the van then build and paint the court at Herne Hill
• One experienced court-build fore(wo)man to figure out how we should do this and then oversee the build... Probably the most important job on the day so please come forward!As this is gonna be a temporary court we're gonna make do for now and weatherproof it as best we can without spending too much money... We'll be using some marine paint on any exposed top edges (possibly covering the top edge of the board with a rail much like one of the courts at the LO), the rest of the wood will be painted with green outdoor paint...
We'll need bodies with as many cordless drills as possible and I'll organise the brushes, rollers and paint...
The court will be fixed on three sides, one side must be removable so the entire MUGA can remain open for other activities at the velodrome...
Er, that's it... List time?
Court build boss(es)
- ??
Hackney volunteers
- ??
Herne Hill volunteers
- TS
- ??
-
• #136
What paint are we gonna use? Who's going to get it?
-
• #137
and I'll organise the brushes, rollers and paint...
.
-
• #138
In to help at Herne Hill and I have x2 cordless drivers.
-
• #139
Ok then, didn't see it cos reading on the phone.
-
• #140
So the court build is gonna be happening this Saturday...
We're gonna need:
• To mark the court out this week before the weekend as well as putting a test screw into the tarmac to show HH we aren't gonna be ruining the surface
• Van and driver (maybe it'll be less hassle to book a man and Luton van, thoughts?)
• Lots of helpers to load the van in Hackney
• Lots of helpers to unload the van then build and paint the court at Herne Hill
• One experienced court-build fore(wo)man to figure out how we should do this and then oversee the build... Probably the most important job on the day so please come forward!As this is gonna be a temporary court we're gonna make do for now and weatherproof it as best we can without spending too much money... We'll be using some marine paint on any exposed top edges (possibly covering the top edge of the board with a rail much like one of the courts at the LO), the rest of the wood will be painted with green outdoor paint...
We'll need bodies with as many cordless drills as possible and I'll organise the brushes, rollers and paint...
The court will be fixed on three sides, one side must be removable so the entire MUGA can remain open for other activities at the velodrome...
Er, that's it... List time?
Court build boss(es)
- ??
Hackney volunteers
- ??
Herne Hill volunteers
- TS
- B
- ??
-
• #141
Court build boss(es)
- ??
Hackney volunteers
- ??
Herne Hill volunteers
- TS
- B
- dt
- moog
- ??
-
• #142
Hackney in the morning, no?
-
• #143
Won't sign up, but if I've healed up a bit I'll come along to HH.
-
• #144
Court build boss(es)
- ??
Hackney volunteers
- Tim
Herne Hill volunteers
- TS
- B
- dt
- moog
- Tim
Is Ed on the forum much? could someone text him? He would be very useful to have along.
- ??
-
• #145
I'm in Devon for the next couple weekends, sorry I won't be there to help and good luck with it all.
-
• #146
I'm away this wkend. Good luck!
-
• #147
- antonio
- antonio
-
• #148
damm can copy paste
-
• #149
in herni hill
-
• #150
Court build boss(es)
- ??
Hackney volunteers
- Tim
Herne Hill volunteers
- TS
- B
- dt
- moog
- Tim
- Antonio
- Paul Cowhen
- ??
Sorry guys, I'll be in Cardiff on Mon and Tues.