-
• #177
Is there electricity at HH we can use? Trying to work out if I should bring drill chargers or not
-
• #178
Yup, there's power in the office portakabin... We should be OK, Ed...
-
• #179
PS Anyone know what access to Ryan's yard is like? Is the wood easily accessible?
Cheers, it only just occurred to me...
-
• #180
Very accessible, just reverse in and start loading.
-
• #181
Nice one... Thanks, Ben...
-
• #182
probably worth taking the van to toolstation if we need to pick up 15 odd cans of paint?
-
• #183
Yup, that's what we'll do, Dave...
-
• #184
can one of you guys pm me your number? I'm working until 5 (although I'll probably do one at 4), so I'll head over afterwards but via public transport.
-
• #185
have drill, but will it be necessary? won't get there until half 4 or 5
-
• #186
Think we'll probably be ok with just a few, can split painting/construction duties
-
• #187
B and I are picking up the van at 10am then driving straight up to Hackney, should be there by 11, maybe just before...
We should be at Herne Hill for about 1.30-1.45...
See you all in a bit! :)
PS I've just bought some heavy duty rubber gloves from the pound shop, should save our hands from a few splinters...
-
• #188
Timings from earlier in the thread:
11am Meet at oak Cycles
11:30am Load van(s)
12:45 pm Drive to HH
1.45pm Arrive at HH
2-2.30pm Move uprights/boards onto MUGA
2.30-4.30pm Build court
4.30-6.30pm Paint court
7pm Celebrate with beer and pizza!.
-
• #189
Looks like I'll have time to help with the load aswell, overground looks to be working... I'll text someone if I get lost.
-
• #190
I'll be down at HH about 2.
-
• #191
Running a tiny bit late...
-
• #192
I'll aim for 2 at HH too
-
• #193
Should be at the workshop in half an hour.
-
• #194
Think I can make the HH side of things
-
• #195
Hoping to be there 2/2.30
-
• #196
All hands on deck for 2pm. We have a half an hour window to unload.
-
• #197
Apologies, running late.
-
• #198
On my way
-
• #199
I just got here, by the grandstand if anyone's about
-
• #200
Shit, I just surfaced will be at hi as soon as I can
We're gonna need enough paint to cover 384m/sq (each board is 8' x 4' = 2.97m/sq, so 6m/sq per board x 40 boards) plus the uprights...
Just spoken to the manufacturer of Fence Mate, they say we'll be able to cover between 6-9m/sq of untreated ply with 1 litre of their product... So if we err on the side of caution we're gonna need 13 x 5 litre tubs of paint and then a few more to make sure we can cover the uprights...
8 x roller kits...
5 x sets of brushes...
1 x 2.5 litre tin of yacht varnish for the tops of the boards?
How does that sound?
Do we have any wood screws left over from the open? What size did we use at the LO?