Frame is finished and is well within tolerance which is a relief. It still needs a large amount of clean up, so don't worry too much about the mess.
(It's not a low pro, just a funny angle)
To aid in my cleaning up of the excess flux, I needed to put the frame in my dedicated soak tank.
However, I am not allowed to have a dedicated soak tank in the flat, and have no space in the workshop, so it went in the bath.
I was also in evans the other day, and a friendly young man informed me that it mattered not that I had done no training, as they had some magical bars which would add an extra 5 hours to my maximum endurance limit, and increase my wattage output by 76%. So I bought some, problem solved.
Tomorrow I will clean up the frame, build the bike, carbo load and sleep.
Frame is finished and is well within tolerance which is a relief. It still needs a large amount of clean up, so don't worry too much about the mess.
(It's not a low pro, just a funny angle)
To aid in my cleaning up of the excess flux, I needed to put the frame in my dedicated soak tank.
However, I am not allowed to have a dedicated soak tank in the flat, and have no space in the workshop, so it went in the bath.
I was also in evans the other day, and a friendly young man informed me that it mattered not that I had done no training, as they had some magical bars which would add an extra 5 hours to my maximum endurance limit, and increase my wattage output by 76%. So I bought some, problem solved.
Tomorrow I will clean up the frame, build the bike, carbo load and sleep.