I might be wrong here, but normally the builder draws your frame for you (after a consultation) and once you're happy with the drawing (normally after a few revisions) you sign it off and the frame goes into production.
Doing it in BikeCAD now is a good idea if there was no previous drawing, but 14 or Lee should really have done it (be doing it?) in my opinion.
Did they pluck the stay measurements out of the air, or did you send them a bum drawing initially?
I might be wrong here, but normally the builder draws your frame for you (after a consultation) and once you're happy with the drawing (normally after a few revisions) you sign it off and the frame goes into production.
Doing it in BikeCAD now is a good idea if there was no previous drawing, but 14 or Lee should really have done it (be doing it?) in my opinion.
Did they pluck the stay measurements out of the air, or did you send them a bum drawing initially?