I bought one 3rd of december last year, shop promised would be here first week of january. Called today, "in 2 weeks". Meh. Getting angry with ice and 25mm tires.
That sounds like you ordered a 2011 bike, they are due on 18/1. I bought a 2010 bike (it actually arrived today less than 24 hrs after we ordered it).
If it's the 2011 you want specifically then it will be a two week wait, if you just want a Steamroller regardless, or in fact prefer the 2010 spec (they have a few differences), and if you want to save about £50, you could try asking at the shop if they can revise the order to a 2010 for you.
Of course, because the '10 is obsolete you can't get all sizes now from the distributor, have a look on Ison Distribution under track bikes to see if your size is available. You can't order from Ison, a shop has to do that.
That sounds like you ordered a 2011 bike, they are due on 18/1. I bought a 2010 bike (it actually arrived today less than 24 hrs after we ordered it).
If it's the 2011 you want specifically then it will be a two week wait, if you just want a Steamroller regardless, or in fact prefer the 2010 spec (they have a few differences), and if you want to save about £50, you could try asking at the shop if they can revise the order to a 2010 for you.
Of course, because the '10 is obsolete you can't get all sizes now from the distributor, have a look on Ison Distribution under track bikes to see if your size is available. You can't order from Ison, a shop has to do that.
Ignore all that if you want a 2011
Hope that helped.