ok now it's here im a bit more excited than i thought i would be
currently have a wiggle basket with boring stuff like bb, consumables, discs (gone 160mm?), adapters, bolts, also a 11 speed m5100 drive train with 52t casette which should take care of the shifting
need:
hydro brakes
crankset which can mount a 30t
get the fork serviced
get the bars i want from freshtripe
other than this for the build up i have decided i will not be going dropper and tubeless, and will save those expenses for a later date,
hoping to have this done for the end of september and have a mtb ready before epping turns into mud all winter?
ok now it's here im a bit more excited than i thought i would be
currently have a wiggle basket with boring stuff like bb, consumables, discs (gone 160mm?), adapters, bolts, also a 11 speed m5100 drive train with 52t casette which should take care of the shifting
need:
hydro brakes
crankset which can mount a 30t
get the fork serviced
get the bars i want from freshtripe
other than this for the build up i have decided i will not be going dropper and tubeless, and will save those expenses for a later date,
hoping to have this done for the end of september and have a mtb ready before epping turns into mud all winter?