That sounds a lot, we paid £4k for a replacement combi (same location), 8 rads (one fancy one) and some extra bits and pieces (pipe work rerouting, new fridge water feed, etc). Probably would have been slightly less but we did the boiler and rads 6 months apart.
Maybe the strip out is quite labour intensive but I’d get another quote.
That sounds a lot, we paid £4k for a replacement combi (same location), 8 rads (one fancy one) and some extra bits and pieces (pipe work rerouting, new fridge water feed, etc). Probably would have been slightly less but we did the boiler and rads 6 months apart.
Maybe the strip out is quite labour intensive but I’d get another quote.