You are reading a single comment by @konastab01 and its replies. Click here to read the full conversation.
  • So I can manage expectations, how long does the hive think it will take a novice to replace 400 7x28 tiles in an already fitted kitchen.

    • 5 clear hrs to remove the old tiles
    • an evening of tidying up the surface
    • 3 evenings to lay them
    • 1 evening to grout

    Does that feel right?

    I removed a full tiled kitchens worth of tiles once and my memory was ripping through 80-90% in no time then spending forever on the remainder.

    Also if anyone has a good YouTube that would be appreciated.

    Cheers.

  • Removing tiles is a mine field, could end up with a replaster if the wall comes away which it usually does.

About

Avatar for konastab01 @konastab01 started