Does single phase matter? I'd love a 3-phase lathe but that isn't happening...
I currently have a 60A main fuse but apparently getting that uprated to 100A is simple. I doubt we use much more than 30A peak at the moment though as we don't have many high loads. Would probably be different if I put heaters in sheds.
Single phase doesn't matter at all (although I would also like 3 phase tools!)
Its more the fact that electrician is worried about current load on the line, Already have a 4 bed house, double garage, log cabin and workshop running off it.
Does single phase matter? I'd love a 3-phase lathe but that isn't happening...
I currently have a 60A main fuse but apparently getting that uprated to 100A is simple. I doubt we use much more than 30A peak at the moment though as we don't have many high loads. Would probably be different if I put heaters in sheds.
What do you actually use?