• We now have the brakes complete, the battery boxes have been re-instated and the fuse box/rev limiter/switch box made. the front roll cage has been removed (again!) to refit the orig dash and switches/guages and wire up.

    the big zorse has been ordered, along with the lexan side windows/slidy vents (overkill!), so we will at least look and sound pro at the back of the grid...

    exciting. i have three more days of study, then I am in a race to finish before the end of feb.

About

Avatar for TRA @TRA started