Path progress: After levelling sand for the past couple of days and knocking out the last of the concrete at the bottom edge I was all set to replace it with a shiney new kerb stone. But the new edge, with its top edge where it needs to be, only comes down to the existing lower deck.
Will I get away with cementing it in with mortar at the back and sides, considering this will only see relatively light foot traffic?
The other option is dropping down another inch and re-levelling the sand, but this will really mess with the interface with the bits at either side. (blocks are not down yet)
Edit: looks like TP do a 250mm deep edge, I guess I'll be getting me one of them.
Path progress: After levelling sand for the past couple of days and knocking out the last of the concrete at the bottom edge I was all set to replace it with a shiney new kerb stone. But the new edge, with its top edge where it needs to be, only comes down to the existing lower deck.
Will I get away with cementing it in with mortar at the back and sides, considering this will only see relatively light foot traffic?
The other option is dropping down another inch and re-levelling the sand, but this will really mess with the interface with the bits at either side. (blocks are not down yet)
Edit: looks like TP do a 250mm deep edge, I guess I'll be getting me one of them.