I've just had an email from TFL re: CS11 and delays during construction. Are they doing the whole thing or just the section around Swiss Cottage? It looks like the latter from the links on the email they sent but there wasn't really an indicator what the full thing used to be.
I've just had an email from TFL re: CS11 and delays during construction. Are they doing the whole thing or just the section around Swiss Cottage? It looks like the latter from the links on the email they sent but there wasn't really an indicator what the full thing used to be.