You are reading a single comment by @dst2 and its replies. Click here to read the full conversation.
  • Thames Water engineers say it will take them three weeks to remove the berg, which is blocking a stretch of Victorian sewer more than twice the length of two Wembley football pitches.

    1/4 the length of 16 Wembley football pitches.

About

Avatar for dst2 @dst2 started