It's been shipped from the Seven factory, delays both with Enve providing the fork and with the Seven paint shop were why this has take 4 months rather than the advertised 5-7 weeks.
That said... I'm excited.
Need to get the wheels, stem and seat post over to Cyclefit, and Cyclefit are busy ordering the Shimano stuff.
The Shimano stuff is roughly:
Dura Ace Di2 9170 (the hydraulic brake stuff)
Power meter cranks
It's the bling end of the scale.
One never knows, but perhaps there is suddenly hope that this will be ready in time for the Dunwich Dynamo (my optimism has given way to rides at least 1+ month away).
Page 24?!
Do we have a frame and fork yet?
Almost.
It's been shipped from the Seven factory, delays both with Enve providing the fork and with the Seven paint shop were why this has take 4 months rather than the advertised 5-7 weeks.
That said... I'm excited.
Need to get the wheels, stem and seat post over to Cyclefit, and Cyclefit are busy ordering the Shimano stuff.
The Shimano stuff is roughly:
It's the bling end of the scale.
One never knows, but perhaps there is suddenly hope that this will be ready in time for the Dunwich Dynamo (my optimism has given way to rides at least 1+ month away).