You are reading a single comment by @rive_gauche and its replies.
Click here to read the full conversation.
-
run the cabling in segregated basket containment in the ceiling void, then drop down into power poles >
- http://www.marcocm.com/aluminium/power-pole
- http://www.marshall-tufflex.com/shop/shopimages/sections/extras/PowerPoles%20and%20PowerPosts.pdf
- http://www.schneider-electric.co.uk/en/product-range/60821-powerpoles-and-powerposts/
ensuring fire rating of ceiling and joints is maintained
- http://www.marcocm.com/aluminium/power-pole
Hi folks, Planning on having an open plan electronics lab built for 20 of our people. But with movable stud walling to allow offices to be created/moved. Much head scratching on what approach to take on power and data distribution - want to be able to reconfigure the layout as the departments evolve, with as little trailing cable as possible - all suggestions welcomed!