-
-
-
-
-
-
-
New welding setup means there is minimal progress on my polo shell.
I have managed to plug weld some old holes in the strut tops, stitch them in and seam stitch both chassis legs.
I need to order some steel sheet in to fabricate the rest of the gussets that need to go in the front end, and i'll be getting a load of bits laser cut too.
Some of the welds aren't the prettiest, but thats partly due to there being boat loads of seam sealer thats nearly impossible to remove.
Will do more at Christmas when i'm next back home.
-
-
-
-
-
-
-
-
I'd go Bedford too -I took my friends Carrera C2 to Bedford and Woodbridge.
Both were good, it rained a lot at Woodbridge which gave us chance to do some sliding about with no real risk of hitting anything but Bedford is a much nicer surface and less aggressive on tyres in the dry
(in my experience anyway)
-
-
-
-
-
-
Putney bridge, silver fixie with fancy seat stays and phil hubs?