^i reckon so indra, honestly i don't know 100% how costing of these things would work but i presume if he's got 5 to do say, everything would be sped up a lot, and labour time is the biggest cost with framebuilders...
anyone else want a superted fork and i might make a thread for a groupbuy?
^i reckon so indra, honestly i don't know 100% how costing of these things would work but i presume if he's got 5 to do say, everything would be sped up a lot, and labour time is the biggest cost with framebuilders...
anyone else want a superted fork and i might make a thread for a groupbuy?