What do they do - do they put a temporary surface on the top or actually chop of all that stuff?
They'd chop them out. Resurface. And then reinstall them again after.
Friend of mine at TFL was/is head of road race stuff for the Tour in '07 and the Games as well. ASO go around telling them what roads they want to use, what road furniture must be removed and road to be resurfaced etc.
They'd chop them out. Resurface. And then reinstall them again after.
Friend of mine at TFL was/is head of road race stuff for the Tour in '07 and the Games as well. ASO go around telling them what roads they want to use, what road furniture must be removed and road to be resurfaced etc.