You are reading a single comment by @vanttera and its replies. Click here to read the full conversation.
  • Good Job!

    do you wanna built it up with a super record group?

    Nope, i have all the old (original) parts just waiting there. There werent any Record or Super Record back in the days. 151BCD cranks (should be inch pitch 3-spider Cinelli but well), 110mm rear hub, 65mm bb etc. BB-shell faced and reamed today, prolly kicking the headset+bb in tonight. Should be ready by the end of the week, although im stilling missing period-visually-correct tubulars. And i need to redo the handlebar tape, dont want any plastic tape on em.

About

Avatar for vanttera @vanttera started