You are reading a single comment by @Arttu and its replies. Click here to read the full conversation.
  • I'm in a very similar boat, although not with Mielec. Except I knew this would be a long build, and was informed of this. I was expecting/hoping for 12 months. Most of the delays after that have been as much my own, as the builders. Fatbikes just arent standard. I'm not sure if this is the case with Mielec. But IMHO its understandable that a small builder will need to keep easier builds going out the door. I personally did'nt pay for all the extra man hours my frame has demanded. So I'm not going to complain about them.

    Hope this works out for you.

    I understand that fatbikes are hard and they have had trouble building it, and the long lead time (which isn't really that long for a custom frame) is understandable. What I don't understand is lying about the progress. At one point he said that It'll be ready in a week, and then 3 weeks later said that they haven't even started because they've had problems with their plotter and haven't got the drawings out.

About

Avatar for Arttu @Arttu started