I'm tempted to wire in the heavy duty supply which must be for the boiler element, and plug in the 13A which I assume must be the pump and the control circuits/board, but I'm at a bit of a loss as to what I should do with the multicore- any advice please?
I'm tempted to wire in the heavy duty supply which must be for the boiler element, and plug in the 13A which I assume must be the pump and the control circuits/board, but I'm at a bit of a loss as to what I should do with the multicore- any advice please?