• Some more info:

    Summary of the changes:

    **Pros
    *** Southbound cycle lane outside Bf station mandatory and 1.5m - March plan - section eliminated

    • Traffic lanes outside Bf station reduced from 3 in March proposal to two (same as interim)
    • Cycle crossing from Embankment to moved to diagonal across island - reduces conflict with peds.
    • Yellow box narrowed and extended
    • Bike lane northbound on bridge widened from March plan to 2.5
    • Bike lane at island widened to 2m from 1.5m

    **Cons
    *** 30 mph reintroduced

    • Pavement space taken away from pedestrians
    • Priority still given to high capacity motor traffic flows
    • Opportunity missed for creating a satisfactory junction for all road users
    • Double T junction not considered or referred to in letter
    • Cycle lanes not extended to bus stops as suggested
    • Protected lane northbound left as a narrow 1.4m
    • Southbound traffic lane into Embankment widened to create additional traffic lane
    • Temporary crossing for pedestrians to be removed as planned
    • ASL at right turn into Q Vic St removed
    • No action to make Watergate two way for cycling
    • No action on South approach to Bridge or at Ludgate Circus