You are reading a single comment by @deleted and its replies. Click here to read the full conversation.
  • good to see,
    it takes so long because every metre of changed designation has to be wrangled over by 20 people in different offices. Then every metre of changed designation has to be safety audited by 20 people in different offices.Then every metre of surfacing, ground work on kerbs, dropped kerbs has to be arranged, scheduled for work, then every metre has to be installed on the ground,
    then every fucker has to say how much they liked it before.

About

Avatar for deleted @deleted started