I think the questions in bold could be a problem. I can't see them releasing the third one for data protection reasons. Two years is a long time and I would imagine far pre-dates that hole, six months would probably have been better, but good luck with it. They're good questions anyway.
- Dates of all safety inspections undertaken on the carriageway in the two years preceding today's date. - Details of all carriageway defects identified during safety inspections in the two years preceding today's date.
Details of how carriageway safety inspections are undertaken, including whether walked or driven, the speed of the inspection vehicle and the number of persons in the vehicle.
The intended frequency of carriageway safety inspections. - Details of all complaints and/or enquiries relating to the carriageway, received in the two years preceding today's date.
The hierarchy classification.
The road/section number.
The defect intervention criteria adopted in relation to the identification of all categories of carriageway potholes (in other words, how a pothole is defined as requiring attention).
The time period(s) adopted between identification and repair (temporary and permanent) of all categories of carriageway defects.
Whether or not TfL has formally adopted all or part of the standards contained within the national code of practice for highways maintenance management.
I understand that this information should be provided within a maximum of 20 days, however, I would appreciate a speedier response.[/I]
I think the questions in bold could be a problem. I can't see them releasing the third one for data protection reasons. Two years is a long time and I would imagine far pre-dates that hole, six months would probably have been better, but good luck with it. They're good questions anyway.