You are reading a single comment by @wvm and its replies. Click here to read the full conversation.
  • concrete foundations in trench (3.8 x 283m3)

    3.8 x 283m3 = 1075.4m3

    divided by 6.5m3 (1 full load readymix) = 165 lorry loads

    I think you may want to check your sums ;)

About

Avatar for wvm @wvm started