concrete foundations in trench (3.8 x 283m3)
3.8 x 283m3 = 1075.4m3
divided by 6.5m3 (1 full load readymix) = 165 lorry loads
I think you may want to check your sums ;)
@wvm started
London Fixed Gear and Single-Speed is a community of predominantly fixed gear and single-speed cyclists in and around London, UK.
This site is supported almost exclusively by donations. Please consider donating a small amount regularly.
3.8 x 283m3 = 1075.4m3
divided by 6.5m3 (1 full load readymix) = 165 lorry loads
I think you may want to check your sums ;)