You are reading a single comment by @Hulsroy and its replies.
Click here to read the full conversation.
-
Let's see if I can do it. But it should be realistic. All the hard bits are done. Biggest issue is the 2x chain set vs 68mm BB vs 48mm tyres situation. But I think I got it sorted.
CS dimpling was a new attempt using the quill stop on the pillar drill. It work great, so my new iteration I will make a hard limit for my hydraulic press and make a stop for repeatable action.
A frame in 5 days is very impressive with those 2 short days!
Nice CS dimpling set up!