-
Seems a lot..
We are 3/4 way through our bathroom which was completely stripped out to bare bones
Velux fitted, walls plastered, plumbing, toilet moved, new soilstack, new external waste pipes, blocking up of old window, tiles across 75% of walls, new subfloor, floor tiled, new electrics (ceiling light + wall light + extractor fan + dual fuel radiator), basic 2x4 storage cupboard built next to bath (I will be adding the door to avoid additional carpentry costs), waste removal
£9,000 total (6.5m2 room)
Silly question but what do you get for item 1, insurance etc?