You are reading a single comment by @bobble and its replies. Click here to read the full conversation.
  • Have you engaged trades in this work yet? It’s the type of constraints you need to give builder/scaffolder and see if they think it’s possible.

  • I have got 2 trades lined up. One roofer for the coping stones (20% of total bill), one renderer (80% of total bill, incs the scaff).

    They both seem, ace, have referenced them, have been patient enough to not walk away and have sat through 2 hours of my neighbour talk about his need for parking. render is still to send over his insurance though.

    Going to invite his scaffolder over - good shout.

    2 issues atm are 1) his parking 2) not being able to touch their roof. They suggested we scaffold from our buildings basement flat but that isn't going to work


    2 Attachments

    • Screenshot 2024-10-27 214953.png
    • PXL_20241025_085035499.jpg
About

Avatar for bobble @bobble started