-
I have got 2 trades lined up. One roofer for the coping stones (20% of total bill), one renderer (80% of total bill, incs the scaff).
They both seem, ace, have referenced them, have been patient enough to not walk away and have sat through 2 hours of my neighbour talk about his need for parking. render is still to send over his insurance though.
Going to invite his scaffolder over - good shout.
2 issues atm are 1) his parking 2) not being able to touch their roof. They suggested we scaffold from our buildings basement flat but that isn't going to work
2 Attachments
Have you engaged trades in this work yet? It’s the type of constraints you need to give builder/scaffolder and see if they think it’s possible.