• Are they finally doing away with the Victorian loading gauge with HS2? I can't tell from that picture

    No. If it's any bigger, it won't be possible to move it around the network for maintenance or other.

  • Thanks, I didn't realise the maintenance angle, as naïvely I assumed they would just build a facility next to the new track. Guess we're stuck with the Victorian loading gauge.

  • They'll build a new depot, but stock needs to be moved around all the time - on routes not necessarily related to the service route(s).

    And to be fair, deviating from the Victorian loading gauge would necessitate a huge amount of Civil Engineering work to increase the size of all the tunnels and bridges. It's kind of locked in now.

About