• Wearing lovely green tape to protect the top tube while bolt-on bags are being made.

    Next on the todo-list:

    1. Sorting out bolts, because f**k 3mm hex button heads. All M5 bolts will be replaced by t25 low-profile. Titanium probably, cause why not.
    2. Finish wiring.
    3. Install aerobars
    4. Replace bar tape
    5. Actually ride?

About

Avatar for Hulsroy @Hulsroy started