I just installed a floor like this and I have 3 planks left over. How does needing spares work? Don't you have to take up the entire floor to get to the bit that needs replaced (or at least work back from the last installed piece)? Maybe I should get another box whilst I can
If they're tongue and groove you can cut out the board you need to remove, then just cut off the tongue of the replacement board and drop it in. There's still enough edge surface for the glue bond to.
I just installed a floor like this and I have 3 planks left over. How does needing spares work? Don't you have to take up the entire floor to get to the bit that needs replaced (or at least work back from the last installed piece)? Maybe I should get another box whilst I can