• I'm not sure you can apply agile methodology to physical buildings with expensive materials. Rolling back software is minimal cost, undoing a wall is labor and wasted material?

  • Yeah obvs not rolling stuff back but more stages. MVP could be base structure, final product would be decoration.

About

Avatar for chrisbmx116 @chrisbmx116 started