I'm not sure you can apply agile methodology to physical buildings with expensive materials. Rolling back software is minimal cost, undoing a wall is labor and wasted material?
Yeah obvs not rolling stuff back but more stages. MVP could be base structure, final product would be decoration.
Sounds like shell and core which is already A Thing for commercial buildings.
https://www.archdaily.com/797779/half-a-house-builds-a-whole-community-elementals-controversial-social-housing https://www.architectural-review.com/buildings/revisit-aranya-low-cost-housing-indore-balkrishna-doshi
:)
@chrisbmx116 started
London Fixed Gear and Single-Speed is a community of predominantly fixed gear and single-speed cyclists in and around London, UK.
This site is supported almost exclusively by donations. Please consider donating a small amount regularly.
I'm not sure you can apply agile methodology to physical buildings with expensive materials. Rolling back software is minimal cost, undoing a wall is labor and wasted material?