• Yeh what a fuck up. C grade maths.

    So 200 x 4 =800 a day.

    800 x 5 = 4500 a week.

    Call it 6 weeks = 20 to 24k in basic wages.

    2k for the electrics and 2k for the plumbing. 2k for the tiling. 2k for the roofer. 1500 for 2 velux, a roof light and 2 basic upvc windows

    15k for the wood, steel, felt, cladding, scaffolding, chipboard at the absolute max.

    There is still 30 to 50k of profit here for the loft company, especially if most of it isnt going through the books which happens extremely often.