• First invoice paid, list of work to date

    Strip all body work of existing paint and body filler from previous repair work
    Strip to bare metal substrate
    Treat bare metal surface with zinc phosphate coating to prevent flash corrosion
    Remove additional components such as doors, bonnet etc
    Begin removal of nearside rear lower quarter panel due to corrosion
    Prepare inner wheel arch for fabrication and welding work
    Prepare and test fit/align new panel
    Cleco new panel in preparation for welding work
    Template areas as discussed for welding repairs
    Prepare inside of door shut areas and backs of panels to appropriate finishing edge In preparation for epoxy primer stages
    Finesse body work to all previous body work repairs to offside rear quarter panel ,offside lower door
    Shallow dents on the existing body work

About

Avatar for jono84 @jono84 started