Discovered the first big fuck-up on my part; I miscalculated the width of the central pier, so the brick slips didn’t line up. Had to get the angle grinder out to re-jig the entire picture window aperture 40mm to the left.
Another side effect is we will now have a single column of bricks under the picture window that will be 30mm narrower than the rest… gonna make my eye twitch into eternity sozlol.
Wait. You planned this all by yourself? With an architectural technician/structural engineer for the technical stuff? Or do you have a background in the field or layman? If layman quite impressive. And if so, yes, expect more fuckups..;) even the pros (..err, me) do.
As I've said before, I have no idea what I'm doing.
The hardest part so far was figuring out how to squeeze all the MVHR plant into the bathroom alcove, and how to route all the ducting to all the rooms without ending up with nasty boxing-in everywhere or devastating the house.
Bath flipped, tiles going up, brick slips going on…
Discovered the first big fuck-up on my part; I miscalculated the width of the central pier, so the brick slips didn’t line up. Had to get the angle grinder out to re-jig the entire picture window aperture 40mm to the left.
Another side effect is we will now have a single column of bricks under the picture window that will be 30mm narrower than the rest… gonna make my eye twitch into eternity sozlol.