Penultimate job before the gang gets back this evening. I reckon tiling has the best effort-reward ratio in the world of DIYing.
As ever, not perfect, but good enough for a first proper go (bar a tiny box to hide the boiler pipes).
Will get more trim to cover the gap in the bottom and also pin to the top-underside to tie it all together.
If it’s of interest - tiles are Topps’ ‘Matrix’, bone colour, some matte, some gloss, and orange grout/trim from the same range.
This looks brilliant btw
@fredtc started
London Fixed Gear and Single-Speed is a community of predominantly fixed gear and single-speed cyclists in and around London, UK.
This site is supported almost exclusively by donations. Please consider donating a small amount regularly.
Penultimate job before the gang gets back this evening.
I reckon tiling has the best effort-reward ratio in the world of DIYing.
As ever, not perfect, but good enough for a first proper go (bar a tiny box to hide the boiler pipes).
Will get more trim to cover the gap in the bottom and also pin to the top-underside to tie it all together.
If it’s of interest - tiles are Topps’ ‘Matrix’, bone colour, some matte, some gloss, and orange grout/trim from the same range.