Yep. It's basically just two flat planes of SIP panels: one roof, one front wall (as well as building a new party wall in brick on the side, to match the one that was already there on other side). Interior wall between old house and extension came down on Saturday and the builders should finish installing the steel beam today. Props should be down mid-week.
Yep. It's basically just two flat planes of SIP panels: one roof, one front wall (as well as building a new party wall in brick on the side, to match the one that was already there on other side). Interior wall between old house and extension came down on Saturday and the builders should finish installing the steel beam today. Props should be down mid-week.