I've started installing our IKEA kitchen. Been triple measuring where to put the rail, how the cabinets will line up on the first wall etc because it's all wonky, finally get it in a position I'm happy with, do a test hole + plug to test if it's strong enough, the second hole I drill is right through a bloody electrical cable. One I've just spend the last week plastering over and know exactly where it is and right above the socket so not even hidden. Urrgh
I've started installing our IKEA kitchen. Been triple measuring where to put the rail, how the cabinets will line up on the first wall etc because it's all wonky, finally get it in a position I'm happy with, do a test hole + plug to test if it's strong enough, the second hole I drill is right through a bloody electrical cable. One I've just spend the last week plastering over and know exactly where it is and right above the socket so not even hidden. Urrgh