You are reading a single comment by @J0nathan and its replies. Click here to read the full conversation.
  • Got some minor ingress here. Need to get pointing sorted, until then, anything I can do asap? I have some heavy duty waterproof gorilla tape, but don’t want to make things worse by using it.


    3 Attachments

    • IMG_2949.jpeg
    • IMG_2952.jpeg
    • IMG_2951.jpeg
  • That tape will make a big sticky mess and likely pull everything apart when you come to take it off to do the repair properly.

  • If that damp patch is directly below the cracked / missing pointing above the 'flashing' you could do worse than getting some flash tape and doing a temp bodge until you can get it fixed properly.

    Another alternative might be to fix the pointing with CT-1

    Both of these bodges, done 'right' could last a good number of years.

  • I haven't quite followed other people's replies, but for a temp fix you could use "flashing tape" to cover the join between brick and upstand tile, it's malleable and intended to adhere to uneven surfaces. Get as good a job as you can along the top. When you get it fixed you could consider proper flashing which is chased into the mortar between bricks.

About

Avatar for J0nathan @J0nathan started