Rebuild time. I’m going to be putting this back into mtb guise with the Monkeylites, 9-speed X0 and DX brakes as per the original build. I’ve been putting this off for ages because the bars, 9-speed stuff and brakes are on my cargo bike, and that means practically a full rebuild for both bikes. The 10-speed 105 on this will go back into the stash and I have 10-speed X0 and Avid vees for the cargo.
Rebuild time. I’m going to be putting this back into mtb guise with the Monkeylites, 9-speed X0 and DX brakes as per the original build. I’ve been putting this off for ages because the bars, 9-speed stuff and brakes are on my cargo bike, and that means practically a full rebuild for both bikes. The 10-speed 105 on this will go back into the stash and I have 10-speed X0 and Avid vees for the cargo.