GRP roof done, powdercoated edge trims on, windows going in tomorrow, loft nearly watertight and ready for scaffolding to come down. A couple of weeks behind schedule.
Sewerage going in and digging begun on the ground floor; lowering the floor level by ~450mm and making space for 180mm of PIR insulation plus slab with wet UFH. Can’t wait to blitz the slab and walls in the new year…
GRP roof done, powdercoated edge trims on, windows going in tomorrow, loft nearly watertight and ready for scaffolding to come down. A couple of weeks behind schedule.
Sewerage going in and digging begun on the ground floor; lowering the floor level by ~450mm and making space for 180mm of PIR insulation plus slab with wet UFH. Can’t wait to blitz the slab and walls in the new year…