We were having the whole roof re-battened, felted and tiled anyway so it didn't change the overall cost by a big %, but even when the roofer was up there quoting, they had no real clue until the felt was off. Lesson being, assume a full replacement and be pleasantly surprised with the bits that need less work.
fark. messy.
@christianSpaceman thanks. I guess I roof inspection would be in short order if we make an offer. The ceiling I posted is the 1st floor, below the conversion, so it was more concerns about loading, though I've just been sent the building regs certificate so I'll have a closer look at that.