You are reading a single comment by @andos and its replies.
Click here to read the full conversation.
-
@Grumpy_Git luckily we have resolved the step height issue as the BC Inspector took the measurements from the top of the threshold and not the actual internal floor height, he's agreed that we're ok as we are below the maximum and each riser is the same height.
We've now flipped the doors inward as well so hoping we can get this shit put to bed so we can move house!
Plastic sheeting down. Really weak mortar mix and put some slabs on top.
Remove after the ink has dried?