Totally an electricians job. It's a requirement if there's any notifiable work on the consumer unit, things like adding a circuit or changing the consumer unit. Otherwise it's not a retrospective requirement.
There were other forms of equipotential bonding required in the regs before the current ones so most installations have some going on depending on their age.
Okay thanks a lot for the explanation. I've reached out to the gas engineer that installed that pipe to ask if that was done or is needed. Is this typically more likely to sit with an electrician?