Yeah, simultaneous double dormer loft and moving the bathroom from the back of the ground floor to the first floor.
Most contractor quotes came in around £140K+VAT, excluding all of the doors & glazing, roof lights, kitchen, bathroom fittings, boiler etc etc, so a fair whack on top of that to finish.