Yeah, simultaneous double dormer loft and moving the bathroom from the back of the ground floor to the first floor.
Most contractor quotes came in around £140K+VAT, excluding all of the doors & glazing, roof lights, kitchen, bathroom fittings, boiler etc etc, so a fair whack on top of that to finish.
Here you go.
I've also attached a couple of pics of exterior designs we're going to be shamelessly ripping off.