• I'm selling this as we are upgrading to something larger - it's been in the second welding bay and hasn't been used much - only for TIG so no splatter. Some marks from use.
    It's 1200x800 with a 12mm plate and 16mm holes spaced 50mm apart.
    The top plate is the 8.7 plasma nitrated version - so heat treated tool steel quality. Made in Germany. More here:
    https://www.siegmund.com/en-gb/Products/Siegmund-Workstation,4848.php
    Most industry welding clamps are designed around 16mm holes so you are not stuck with Siegmund - although they are best.
    This is a different kettle of fish to the lasercut versions about, proper durability and you get the storage below.
    This is ideal for a bike frame jig laying flat - use prism tube v-blocks shimmed to the correct height for the tube diameter and hold down with tube clamps. Very accurate and very simple.

    New cost was
    £1300+vat table with drawers with promo offer from the time.
    £200ish delivery from Germany
    £200+ - 4x table extensions
    £40 - fixings for extensions
    £100'odd - extra drawer
    £80 casters - we made our own trolley to raise it up and add the casters. It just sits in the trolley So is removable.
    Please bear in mind the pictures show a gap in the drawers, that is now filled with an extra drawer so it has 5 drawers.

    Selling for £1200+vat ono
    Currently in Norwich but can bring down to Harlow, Essex just outside of London.
    It's heavy, 4 person struggle to lift - but the top can be unbolted if you don't have 6 people or a forklift. Could be shipped on a double pallet for approx £150'ish potentially.

    Will leave here for a week and hope for a nice buyer before trying the racket on eBay or elsewhere. 🙏

    Not sure if the attachment works, will try again in the morning.


    5 Attachments

    • Screenshot_20230919-053947.png
    • Screenshot_20230919-053931.png
    • Screenshot_20230919-053943.png
    • Screenshot_20230919-053951.png
    • Screenshot_20230919-053939.png
About

Avatar for Fishfabs @Fishfabs started