Excited for shed building weekend.
Loose tonne of gravel for the base grids arriving 8am, approx 200m to the plot, shed due anytime between 8am and 6pm.
Whatever time it arrives I’d ideally like to paint it prior to assembly so I can get all the end grain etc.
I’m guessing the time screwing the shed together will be a drop in the ocean compared to hauling all the materials up to the plot. Haven’t done a solid morning of brainlessly barrowing gravel since I was an apprentice.
Excited for shed building weekend.
Loose tonne of gravel for the base grids arriving 8am, approx 200m to the plot, shed due anytime between 8am and 6pm.
Whatever time it arrives I’d ideally like to paint it prior to assembly so I can get all the end grain etc.
I’m guessing the time screwing the shed together will be a drop in the ocean compared to hauling all the materials up to the plot. Haven’t done a solid morning of brainlessly barrowing gravel since I was an apprentice.