• So the new lowered suspended subfloor has now been started. The existing sleeper wall things removed and rebuilt today. The builders were waiting for mortar to set so didn't attach the joists but they've all been cut to size. Hopefully fully framed out tomorrow so the plumber can come for some first fix and UFH on Wednesday. Not sure I would have gone to the effort of lowering everything if all of the services hadn't had to be moved anyway.
    All of the electrical circuits seem to contain things they shouldn't so everything seems to need to be remediated.


    2 Attachments

    • 20230731_175031.jpg
    • 20230731_175022.jpg
About

Avatar for user67526 @user67526 started