The kitchen ceiling came down yesterday and the 6" x 2" timbers for the new suspended floor arrived. Quite a few leaks have been coming through from the bath above so that'll need some new silicon. Despite there being a dust door, there's a very fine layer of dust all through the house and the novelty of cooking dinner in the pissing rain on a small camp stove has worn off 😂
I have realised that I'd never be able to cope with a new build or extension. Thoughts and prayers to all the heroes that have.
The kitchen ceiling came down yesterday and the 6" x 2" timbers for the new suspended floor arrived. Quite a few leaks have been coming through from the bath above so that'll need some new silicon. Despite there being a dust door, there's a very fine layer of dust all through the house and the novelty of cooking dinner in the pissing rain on a small camp stove has worn off 😂
I have realised that I'd never be able to cope with a new build or extension. Thoughts and prayers to all the heroes that have.